ADU permit help
How ADU Permits Work in Santa Monica
In Santa Monica, an ADU that meets the written standards needs only a building permit. The work is in getting a complete, correct submittal through plan check, and knowing which extra steps your parcel triggers.
Who Issues ADU Permits in Santa Monica
Inside city limits, ADUs go through the Community Development Department. Two divisions share the work. City Planning applies the ADU standards in Municipal Code Section 9.31.025 and handles deed restrictions where they are needed. Building and Safety runs plan check and issues the building permit, then sends inspectors during construction.
Approval is ministerial. That means no design review, no public hearing and no discretionary decision. If the drawings meet the code, the permit is issued. The practical effect is that the quality of the submittal, not persuasion, decides how fast you move.

State Deadlines for Santa Monica ADU Applications
Two state timers govern the city's side of the process. The first is short: as of 2026, Santa Monica gets 15 business days from submittal to say in writing whether the package is complete, naming whatever is missing. The second starts when the package is complete and a home already stands on the parcel. From that point the city has 60 days to issue its decision, and if the answer is no, the letter has to spell out each problem and what would cure it.
Disagree with an incomplete finding? The city must give you an appeal path, and the appeal gets a written ruling within 60 business days. None of these timers count the days your own team spends on corrections, which is why the package we send is built to need as few of them as possible.
- Completeness ruling: 15 business days
- Decision on a complete file: 60 days
- Each denial lists the problems and fixes
- Appeals decided within 60 business days
Coastal Zone, Deed Restrictions and Historic Listings
Some Santa Monica parcels need more than the building permit. Lots inside the Coastal Zone, mostly in the western part of the city, can carry a second approval: the Coastal Commission may require a coastal development permit or agree to waive one. We check the parcel's coastal status first so that step runs alongside the building permit rather than after it.
R1 lots that add the extra attached or detached ADU the city allows must record a deed restriction against the property. City Planning handles that document. And for homes listed on the California Register of Historical Resources, added standards or steps may apply. A house that is not on that register is reviewed like any other.

ADU Permits in Los Angeles Neighborhoods Next to Santa Monica
Los Angeles, not Santa Monica, governs Sawtelle, Mar Vista, Venice and Santa Monica Canyon, even where an address carries a Santa Monica ZIP code. ADUs there go through LADBS, the Los Angeles building department, under LA's ADU ordinance. The canyon is a common source of confusion: Adelaide Drive marks the boundary, and homes below it are in Los Angeles.
LA brings its own overlays. Venice has a coastal specific plan. The canyon has hillside and fire-zone mapping. Mar Vista includes a historic preservation overlay zone. We look up each parcel in the city's zoning system before design so the drawings are prepared for the right agency and rules.
How We Prepare a Santa Monica ADU Submittal
What goes in: a site plan, the architectural set (plans, elevations, sections), structural drawings with calcs, energy code forms, and soils or survey reports when the lot calls for them. We check it against the city's ADU standards before it goes in, because missing items trigger an incomplete notice and restart part of the clock.
During plan check, we answer correction comments directly and resubmit. Once the permit is issued, the same team builds the project, so nothing gets lost between the drawings and the field. Inspections follow the city's schedule through final sign-off.
What Our ADU Permit Work Gives Santa Monica Owners
Complete ADU Applications the First Time
Most delays come from incomplete submittals. We assemble the full package, including consultants' reports, before it goes to the city, so the 15-day completeness check finds nothing to send back.
Coastal and Deed Restriction Steps Tracked
Parcels that need coastal approval or a recorded deed restriction have extra paperwork. We track those steps alongside plan check instead of discovering them at the end.
The Right ADU Permit Agency for Your Address
With the Santa Monica and Los Angeles boundary running through neighborhoods that share ZIP codes, we confirm which city has jurisdiction before drawing anything.
One Team From ADU Permit to Final Inspection
The people who drew and permitted the unit also build it. Inspectors' questions get answered by someone who knows the drawings, which keeps inspections moving.
ADU Permits: Build and Finish Photos



ADU Permits and Approvals Across Santa Monica
FAQs
ADU Permit Questions in Santa Monica
What is the ADU permit timeline in Santa Monica?
Count on two state-set windows plus however long corrections take on your side. The city's completeness answer is due in 15 business days, and its ruling on a complete file in 60 days. Coastal parcels add their own track.
Do neighbors get notice of my ADU permit?
No public hearing is held, because ADU approval in Santa Monica is ministerial. Neighbors cannot appeal a compliant ADU permit the way they might a discretionary project.
Is my home in Santa Monica or Los Angeles for permits?
Check the city limits, not the ZIP code. Santa Monica Canyon has a 90402 ZIP but sits in Los Angeles, below Adelaide Drive. We confirm jurisdiction for every address before design.
Do I need a deed restriction for my Santa Monica ADU?
Some ADUs need one. An R1 lot adding the extra attached or detached ADU allowed beyond the standard combination must record a deed restriction. City Planning handles that step.
What permit fees apply to an ADU?
Every ADU pays for plan check and the building permit itself. What state law removes is the impact fee, for any unit at 750 square feet or under; past that size, the fee has to scale with the main house. We include current fees in the project budget.

ADU consultation
Start Your Santa Monica ADU Permit
Let us know roughly where the property is, what you hope to build and whether drawings already exist. A reply comes within one business day, by phone or email.